Project

Company’s existing hot lime softening system was becoming very unreliable. Continuous softened water was instrumental to their business process. High quality water was also needed to ensure their paint operation section ran uninterrupted.

Solution

Multi-Photo Case Study

Hausers Water designed and installed both a combined equipment pre-treatment and final solution stage system to meet their processing needs.

Products Used

40 GPM RO system (See Photo 1).
Pre-treatment system (See Photo 2).